June 18, 2009

One World Installation

Blank wall ready for mural.

First 2 panels up.

The students worked on the squares along the outside edges. Each younger student was paired with an older one to work as a teem. The interior design was done by me working on my living room floor (no studio space yet).
All 4 large panels up, and 4 smaller side panels in place, ready for the last of the tiling to be done.

World finished and last hand added.


Tiling finished ready for grouting.

No comments:

Post a Comment