January 31, 2009
January 30, 2009
January 28, 2009
January 26, 2009
Five More Done
Today, these five mosaic pieces (picture taken before grouting) moved outside. Yay. That makes a total of 9 of the 22 mosaic pieces for Encased in Concrete 88 done. I began working on the next 5 to be mosaicked today, and worked until I ran out of broken tile.
So, when I get back to work on Wednesday, I have to start my day breaking tile into small pieces. I've already gathered some used floor tile from a local tile shop and tile scraps left from tiling the bathroom at one of my daughters homes to start with. So far I'm not having to buy any new tile and hoping I can make it to the end of the project using only used or salvaged tile.
So, when I get back to work on Wednesday, I have to start my day breaking tile into small pieces. I've already gathered some used floor tile from a local tile shop and tile scraps left from tiling the bathroom at one of my daughters homes to start with. So far I'm not having to buy any new tile and hoping I can make it to the end of the project using only used or salvaged tile.
January 23, 2009
Encased in Concrete 88
This is a photo of my breaking block. I just pull up a stool and break tile with a hammer. It is a great way to get out some built up tension. Today I finished three more mosaic pieces, and started tiling three more. Tomorrow, I'm taking the day off to watch my grandson play basketball. More on Sunday!
January 22, 2009
Encased in Concrete 88
January 12, 2009
Subscribe to:
Posts (Atom)